Title 22 BUILDINGS AND CONSTRUCTION
Chapter 22.02 BUILDING ADMINISTRATIVE CODE OF CLARK COUNTY
22.02.405 Table 3-D plumbing permit fees.
|
Table 3-D--Plumbing Permit Fees
|
|
|---|---|
|
Permit Issuance
|
|
|
For the issuance of each permit
|
$18.00
|
|
|
|
|
System Fee Schedule (in addition to above)
|
|
|
1. Residential water distribution systems
|
|
|
Single-family dwelling
|
$ 8.75
|
|
Multi-family dwelling
|
$10.90
|
|
Plus each dwelling unit
|
$ 4.35
|
|
2. Commercial water distribution systems Per Floor
|
$ 4.35
|
|
Plus each unit (leased space or office)
|
$ 2.85
|
|
3. Hotel or motel water distribution systems
|
|
|
Each building
|
$11.50
|
|
Plus each unit
|
$ 4.35
|
|
4. Trailer/RV Park water distribution systems
|
|
|
For each system
|
$43.50
|
|
Plus each space
|
$ 2.85
|
|
5. Irrigation water distribution system
|
$11.50
|
|
|
|
|
Unit Fee Schedule (in addition to issuance and system fees)
|
|
|
1. Except as specified below, each plumbing fixture or trap
|
$ 2.85
|
|
2. For each building sewer (new, replace, modify)
|
$14.50
|
|
3. For each trailer/RV trap or hookup
|
$ 7.25
|
|
4. Grease or sand interceptor
|
$ 2.85
|
|
5. For each water softener (permanent connection)
|
$ 2.85
|
|
6. For each swimming pool
|
|
|
Private or wading pool (including spa)
|
$29.00
|
|
Public
|
$43.50
|
|
7. For each spa - preformed (private)
|
$14.50
|
|
For each spa - preformed (commercial)
|
$29.00
|
|
8. For each fuel piping system
|
|
|
Single-family dwelling
|
$ 8.75
|
|
Multi-family dwelling
|
$14.50
|
|
Plus each unit
|
$ 2.85
|
|
9. Each commercial fuel piping system
|
|
|
Per floor
|
$ 8.75
|
|
Plus each unit (leased space or office)
|
$ 8.75
|
|
10. Medium pressure gas system
|
$17.25
|
|
11. Each gas appliance
|
$ 2.85
|
|
12. Standby emergency (generating engines), each
|
$ 7.25
|
|
13. Steam boiler, each
|
$ 7.25
|
|
Fees for projects not specified in this schedule shall be determined by the
building official by applying the total value of the scope of work being
performed to Table 3-A of this chapter.
Where appropriate, validated valuations supplied by the applicant may be utilized by the building official. The building official reserves the option of requesting appropriate documentation of stated valuations supplied by the applicant. |
|