22.02.395 Table 3-B electrical permit fees.


Table 3-B--Electrical Permit Fees


Permit Issuance For Issuing permit.
$18.00


UNIT FEE SCHEDULE
(Note: the following do not include permit issuance fee.)



General lighting outlets, receptacles outlets, and switches, each
(Note: For multi-outlet assemblies, each 5 feet or fraction thereof may be considered as one outlet.)
$ .55


For Area Lighting

First 3,000 watts
$11.50
For each additional 1,000 watts
$ 4.35


Appliances up to 1 horsepower (HP), kilowatt (KW) or kilovolt-ampere (KV) in rating.
For outlets, appliances, including wall-mounted electric ovens; counter-mounted cooking tops; electric ranges; self-contained plug-in air conditioners; space heaters; food waste grinders; dishwashers; washing machines; water heaters; clothes dryers; blast coil heaters; or other similar appliances, each
$ 1.00


Appliances - 1 Horsepower, kilowatt, or kilovolt-ampere in rating, or greater.
For motors; generators; transformers; self-contained factory wire appliances; medical and dental devices; food, beverage, and ice-cream machines; laundry machines; rectifiers; converters; capacitors; industrial heating, air conditioners and heat pumps; cooking or baking equipment; or other similar appliance, each
$ 4.35
Busways

For trolley and plug-in-type busways, each 100 feet or fraction thereof
$ 4.35


Services

For each temporary power pole or service
$ 8.75
For services of not over 200 amperes in rating, each, including first meter
$ 8.75
For service over 200 amperes in rating, but less than 600 amperes, including first meter
$18.40
For service over 600 amperes or more, but less than 1,200 amperes, in rating or higher, including first meter socket
$36.20
For services 1,200 amperes in rating or higher, including first meter socket
$72.40
For each individual meter socket
$ .75
For each subpanel or distribution board
$ 4.35
For each recreational mobile home or vehicle space
$ 4.35


Power Limited

For signals, alarm, or television outlets, control panels, antenna, telephone, switchboards, each
$ .45
Fees for projects not specified in this schedule shall be determined by the building official by applying the total value of the scope of work being performed to Table 3-A of this chapter.
Where appropriate, validated valuations supplied by the applicant may be utilized by the building official. The building official reserves the option of requesting appropriate documentation of stated valuations supplied by the applicant.
(Ord. 3618 § 2 (part), 2008)